In 1999, the National Nuclear Security Administration (NNSA) signed a contract with a consortium, now called Shaw AREVA MOX Services, LLC to design, build, and operate a Mixed Oxide (MOX) Fuel Fabrication Facility. This facility will be a major component in the United States’ program to dispose of surplus weapon-grade plutonium.
The facility will take surplus weapon-grade plutonium, remove impurities, and mix it with uranium oxide to form MOX fuel pellets for reactor fuel assemblies. These assemblies will be irradiated in commercial nuclear power reactors.
The design of the facility is based on AREVA’s MELOX and La Hague MOX facilities in France. The French have used MOX technology for almost two decades and currently supply MOX fuel to over 30 reactors worldwide.
The facility is being built at the Savannah River Site (SRS) near Aiken, South Carolina. It will be located in F Area in the center of the 310 mi2 NNSA reservation.
Here are the latest business opportunities:
|
Discipline |
Description |
QA Level |
RFP Issue Quarter* |
Est. Award Quarter* |
Point of Contact |
|
Electrical |
EE012 400/250/125 VDC Batteries/Chargers,3-Phase UPSs |
1 |
4 |
FY12 (1st qtr.) |
|
|
Electrical |
EE015 Specialty Cable |
1 |
4 |
FY12 (1st qtr.) |
|
|
Instrumentation & Controls |
IC001-4 Process Nuclear Instruments 4 Gamma |
4 |
4 |
FY12 (1st qtr.) |
|
|
Instrumentation & Controls |
IC002-4 Personal Dosimeters |
4 |
4 |
FY12 (1st qtr.) |
|
|
Instrumentation & Controls |
IC003 Average Pitot Tube Element |
4 |
4 |
FY12 (1st qtr.) |
|
|
Instrumentation & Controls |
IC006-1 Pressure and DP Indicators/Switches |
1 |
4 |
FY12 (1st qtr.) |
|
|
Instrumentation & Controls |
IC007-1 Temperature Transmitters |
1 |
4 |
FY12 (1st qtr.) |
|
|
Instrumentation & Controls |
IC009-2 Humidity Transmitters/Sensors |
1 |
4 |
FY12 (1st qtr.) |
|
|
Instrumentation & Controls |
IC015-1 Gas Analyzer |
1 |
4 |
FY12 (1st qtr.) |
|
|
Instrumentation & Controls |
IC015-2 Gas Analyzer |
4 |
4 |
FY12 (1st qtr.) |
|
|
Instrumentation & Controls |
IC017-01 I CAB Panels |
1 |
4 |
FY12 (2nd qtr.) |
|
|
Instrumentation & Controls |
IC017-03 Emergency HVAC Control Panels |
1 |
FY12 (1st qtr.) |
FY12 (2nd qtr.) |
|
|
Instrumentation & Controls |
IC018 Cabinets, Enclosures, and Panels |
1 |
4 |
FY12 (1st qtr.) |
|
|
Lab & Instrumentation |
LE036 X-Ray Fluorescence |
1C |
FY12 (1st qtr.) |
FY12 (2nd qtr.) |
|
|
Instrumentation & Controls |
IC020-7 Flow Control Valves |
4 |
4 |
FY12 (1st qtr.) |
|
|
Instrumentation & Controls |
IC023-1 Instrument Racks |
1 |
4 |
FY12 (1st qtr.) |
|
|
Instrumentation & Controls |
IC032 Leak Detectors |
1 |
FY12 (2nd qtr.) |
FY12 (2nd qtr.) |
|
|
HVAC Equipment |
HV609 GB HEPA Filters |
1 |
FY12 (2nd qtr.) |
FY12 (3rd qtr.) |
|
|
Chemical Equipment |
CH715 Utility, Gas and Reagent Tanks |
4 |
FY12 (1st qtr.) |
FY12 (1st qtr.) |
|
|
Chemical Equipment |
CH721-4 Needle and Globe Valves |
1 |
4 |
FY12 (1st qtr.) |
|
|
Chemical Equipment |
CH721-5 Fire Protection Valves |
1 |
FY12 (1st qtr.) |
FY12 (1st qtr.) |
|
|
Chemical Equipment |
CH742 Restricting Orifices |
4 |
FY12 (2nd qtr.) |
FY12 (2nd qtr.) |
|
|
Chemical Equipment |
CH743-1 Standard Thermowells |
1 |
FY12 (2nd qtr.) |
FY12 (3rd qtr.) |
|
|
Chemical Equipment |
CH901 Demin Water System |
4 |
FY12 (2nd qtr.) |
FY12 (4th qtr.) |
|
|
Chemical Equipment |
CH902 Nitrogen Gas & Bulk Gas Storage |
4 |
FY12 (1st qtr.) |
FY12 (2nd qtr.) |
|
|
Chemical Equipment |
CH903-1 Gas Cylinders |
4 |
FY12 (2nd qtr.) |
FY12 (4th qtr.) |
|
|
Chemical Equipment |
CH903-2 Racks for Gas Cylinders |
4 |
FY12 (2nd qtr.) |
FY12 (4th qtr.) |
|
|
Chemical Equipment |
CH905 Chemical Specialty Items |
1 |
FY12 (2nd qtr.) |
FY12 (4th qtr.) |
|
|
Mechanical Equipment |
MM182 BEG Hoisting |
4 |
FY12 (1st qtr.) |
FY12 (1st qtr.) |
|
|
Mechanical Equipment |
MM185 HVAC Vent Stack with Static Air Mixer |
4 |
FY12 (1st qtr.) |
FY12 (1st qtr.) |
Supplier/Subcontractor Registration Forms