Nuclear Street.

← News archive

Fort Calhoun Powers Down for Air Conditioner Repair

Source:

Archived news summary. This item reflects its original publication date. Follow the source link below for the publisher’s full article.

Nebraska's Fort Calhoun nuclear plant was forced to power down this week for a third time since exiting an extended outage late last year.

The reactor was operating normally Tuesday afternoon when an alarm indicated a control room air conditioner was inoperable, according to a report filed with the Nuclear Regulatory Commission. Another air conditioner was down for maintenance, and safety regulations require a reactor to power down if control room HVAC systems are offline beyond a certain amount of time. Operators began powering down the reactor a few hours later, with the unit reaching 33 percent power before one of the air conditioners was repaired.

An Omaha Public Power District spokesman told the Omaha World-Herald the plant was back up to 87 percent power Wednesday morning. The event followed a two-day unplanned shutdown in March to fix a turbine cooling system and a four-day unplanned shutdown in January caused by ice buildup on a water intake. Fort Calhoun reentered service in December after three years of repairs and NRC inspections following flooding at the site and a fire that affected safety equipment. Exelon has been contracted to handle day-to-day management of the plant.


Questions about this archived item? Contact Nuclear Street.